01
Design stage
We review architectural and MEP drawings, finalise the system architecture and station locations, and specify ELV ducts, risers and conduit routes, with a transparent BOQ.
For real estate developers
A centralised video door phone system takes as long to deliver as the building itself. We plan it with your design team, install it in step with construction, and commission it tower by tower as flats are handed over, on projects anywhere in India.

Why plan early
Most video door phone problems in finished buildings start at the design stage: undersized risers, missing conduits to the flat door, no dedicated power for the network. Fixing them later means chasing walls in finished flats.
Bring us in while the ELV and electrical drawings are still open, and every cable route, back box and power point is planned once, correctly, at no extra cost to the project.
How a project runs
01
We review architectural and MEP drawings, finalise the system architecture and station locations, and specify ELV ducts, risers and conduit routes, with a transparent BOQ.
02
Conduits and back boxes for door stations and flat monitors are laid as slabs and blockwork progress, coordinated with your electrical contractor.
03
Fibre and CAT6 backbone through the risers, network racks and the dedicated UPS line, installed floor by floor.
04
Door stations, lobby panels, guard consoles and in-flat monitors are fixed after finishes are complete, so devices stay protected.
05
Each tower is configured and tested flat by flat ahead of possession, and recorded in a unit-wise completion report.
06
As-built drawings, flat-wise device schedules, training for the facility and security teams, and an AMC for the years after possession.
Why developers choose Coremech
Our team stays with the project through the full construction cycle, often one to two years on large developments.
Design, supply, installation, commissioning and AMC from a single team.
Authorised integrator for Hikvision, Dahua, CP Plus and more, so the system is chosen for the project, not the catalogue.
We deliver multi-apartment VDP projects nationwide, managed from our Navi Mumbai base.
FAQ
At the design stage, before the ELV and electrical drawings are frozen. That is when riser sizes, conduit routes to every flat, power points and the UPS location can be planned at no extra cost.
It runs alongside construction. On large multi-tower projects the full cycle commonly spans one to two years, from first-fix conduits to final commissioning, with each tower commissioned ahead of its possession date.
Yes. We deliver multi-apartment video door phone projects across India and manage them end to end from our Navi Mumbai base.
Yes. Door stations can be linked with access control, boom barriers, lift destination control and the project's CCTV, so entry is managed from one platform.
As-built drawings, a flat-wise device and IP schedule, unit-wise test and completion reports, training for the facility and security teams, and an AMC proposal.
Let's talk
Share your drawings and possession schedule. We'll propose the system, the stages and a transparent BOQ.